ENGINEERING MANAGEMENT PROGRAM

 

 

publication record

 

Abdul-Malak, M. U., M. M. H. El-Saadi, and M. G. Abou-Zeid. 2002. Process model for administrating construction claims. Journal of Management in Engineering, ASCE, 18 (2): 1–11.

 

Abdul-Malak, M. U., and Z. A. Hassanein. 2002. Evolvement of contractor's schedule to meet engineer's satisfaction. Journal of the Transportation Research Board, National Research Council, (Washington, D.C.) TRR 1813:295–304.

 

Abdul-Malak, M. U., I. A. Kaysi, and M. G. Abou-Zeid. 2001. Delivery approach for coastal infrastructure facilities: The case of the new transshipment seaport of Sidon. Journal of Infrastructure Systems, ASCE, 7 (3): 1–8.

 

Abdul-Malak, M. U., I. A. Kaysi, and M. S. Shoucair. 2001. Allocation of risks under the BOT delivery approach for transport infrastructure projects. Journal of the Transportation Research Board (National Research Council, Washington, D.C.) TRR 1661:137–147.

 

Hayek, P., and M. K. Salameh. 2001. Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control. 12 (6): 584–590.

 

Hindi, K. S., and K. Fleszar. 2003. An enumerative heuristic and reduction methods for the assembly line balancing problem. European Journal of Operational Research 145:606–620.

 

Hindi, K. S., K. Fleszar, and C. Charalambous. 2003. An effective heuristic for the CLSP with setup times. Journal of the Operational Research Society 54:490–498.

 

Hindi, K. S., H. Yang, and K. Fleszar. 2002. An evolutionary algorithm for resource-constrained project scheduling. IEEE Transactions on Evolutionary Computation 6 (5): 512–518.

 

Kaysi, I. A., and M. U. Abdul-Malak. 2001. Decsion structuring and robustness analysis in selecting urban transit alternative. The Journal of Public Transportation 4 (1): 73–102.

 

Massoud, M., M. El-Fadel, and A. Abdel Malak. 2003. Assessment of public vs. private MSW management: A case study. Journal of Environmental Management 69:15–24.

 

Mezher, T. 2001. Sustainable manufacturing in Lebanon. In Greener Manufacturing and Operations: From Design to Delivery and Back, ed. Joe Sarkis, 121–135. Greenleaf Publishing.

 

Mezher, T., D. Jamali, and C. Zreik. 2002. The role of financial institutions in the sustainable development of Lebanon. Sustainable Development 10 (2): 69–78.

 

Mrad, F., Abdul-Malak M. U., S. Sadek, and Z. Khoudor. 2002. Automated excavation in construction using robotics trajectory and envelop generation. Engineering, Construction and Architectural Management Journal 9 (4): 325–335.

 

Salameh, M. K., N. E. Abboud, A. N. El-Kassar, and R. E. Ghattas. 2003. Continuous review inventory model with delay in payments. International Journal of Production Economic 85 (1): 91–95.

 

Salameh, M. K., and R. E. Ghattas. 2001. Optimal just-in-time buffer inventory for regular preventive maintenance. International Journal of Production Economic 74 (3): 157–161.

 

 

 

Abstracts, Conferences, and Proceedings

 

Abdul-Malak, M. A., T. Mezher, R. M. Shalhoub, and R.G. Osseiran. 2002. Automated unbalancing detection process for construction bid analysis. Proceedings of the 9th International Conference on Computing in Civil and Building Engineering (ICCCBE-IX), 1039–1044. Volume II, Taipei, Taiwan, April 3–5, 2002.

 

Abdul-Malak, M. U., T. Mezher, M. Shalhoub, and R.G. Osseiran. 2002. Automated unbalancing detection process for construction bid analysis. Proceedings of the Ninth International Conference on Computing in Civil and Building Engineering (ICCCBE-IX), 1039–1044 (refereed). Taipei, Taiwan, April 2002.

 

AlKhal, F., R. Chedid, Z. Itani, and T. Karam. 2003. An assessment of the potential benefits from integrated electricity capacity planning in the northern Middle East region. Proceedings of the 2nd Dubrovnik Conference on Sustainable Development of Energy ,Water and Environment Systems, Dubrovnik, Croatia, June 2003.

 

Kassar, A. N., and M. Salameh. 2003. Safety buffer for preventive maintenance and breakdown. Proceedings of the International Conference on Industrial Engineering and Production Management (IEPM 03), vol. 3, 59–68. May 25–28, 2003.

 

Mezher, T. 2002. Complexity of knowledge provisions and management in multi-cultural and multi-lingual contexts. Presented in the Annual Meeting of the Alliance for Global Sustainability (AGS), Building the Future: Leadership, Technology, Global Citizenship, San Jose, Costa Rica, March 21–23, 2002.

 

. 2003. ICT for sustainable development. Presented in Towards E-Lebanon Conference, Phoenicia Inter-Continental Hotel, Beirut, Lebanon, June 13–14, 2003.

 

Mezher, T., M. A. Abdul-Malak, S. Arnaout, and Z. Bassil. 2002. Public projects programming systems: A decision support system for public sector investment. Proceedings of the 9th International Conference on Computing in Civil and Building Engineering (ICCCBE-IX), Volume II, 975–980. April 3–5, 2002, Taipei, Taiwan.

 

Mezher, T., M. U. Abdul-Malak, S. Arnaout, and Z. Bassil. 2002. Public projects prioritization: A decision support system for public sector budgeting. Proceedings of the Ninth International Conference on Computing in Civil and Building Engineering (ICCCBE-IX), 975–980 (refereed). Taipei, Taiwan, April 2002.

 

Nasrallah, W. F. 2003. Modeling reciprocity in political organizations with the interactions value analysis framework. 2nd Human Complex Systems conference at Lake Arrowhead UCLA Center, March 2003.

 

Nimah, M., A. Bsaibes, F. AlKhal, M. R. Darwish, and I. Bashour. 2003. Optimizing cropping pattern to maximize water productivity. Proceedings of the 2nd International Conference on River Basin Management, Las Palmas, Gran Canaria, April 2003.

 

Salameh, M., A. N. Kassar, and N. Chlala El-Khoury. 2003. Exact time discounting of the finite production model. Proceedings of the International Conference on Industrial Engineering and Production Management (IEPM 03), vol. 1, 432–441. May 25–28, 2003.